How It Works

Modern online booking with proper local installation. Clear steps, fixed pricing for standard installs, and tidy workmanship from qualified engineers.

Instant packages £250 refundable deposit Photo check before install Choose your date
1

Pick Your Package

Illustration of selecting a boiler package from comparison cards

Choose a boiler option that fits your home and budget.

Use Boiler Finder or pick from Popular Packages. You’ll see warranties and what’s included.

2

Reserve with Deposit

Illustration of reserving an installation slot on a calendar

Secure your slot with a £250 deposit.

It’s refundable if we can’t proceed after checking photos and requirements.

3

Upload Photos

Illustration of uploading required boiler and pipework photos on mobile

Quick snaps confirm pipework, flue, and access.

This prevents surprises on the day and lets us arrive fully prepared.

4

Choose Your Date

Illustration of choosing and confirming an installation date

Pick a day that suits you.

We confirm the booking, order materials, and you’re set for install day.

On the Day

  • We protect floors and work areas.
  • Safe isolation, swap/installation and commissioning.
  • System checks, controls setup, and full handover.
  • Paperwork provided and tidy finish before we leave.

Want to get started?

Get a Quote

Why We Ask for Photos

Photos let us confirm the flue position, condensate, gas pipe sizing, clearances and access — so your price and install day stay smooth.

Tip: natural light + a couple of wide shots makes approval faster.

What’s Included in the Fixed Price

Similar to what the big online installers list as “all-inclusive” — with the details shown upfront.

Standard Install Includes

  • Boiler + flue accessories
  • Magnetic filter (where applicable)
  • System cleanse/flush option (package dependent)
  • Condensate & safety upgrades (where required)
  • Commissioning, handover & paperwork

Common Upgrades

  • Smart thermostat
  • Boiler relocation
  • Gas pipe upgrade
  • Flue re-route / plume kit
  • Powerflush / cleaning upgrades

If your photos show anything unusual, we’ll confirm it before install day — no last-minute surprises.

How long does it take?

Most standard combi swaps are completed in a day. Relocations can take longer.

Simple Swap

Usually 1 day when replacing like-for-like in the same location.

Relocation

Typically 1–2 days depending on pipework and access.

System Changes

Converting types or major upgrades can take 2+ days.

Payments

Deposit secures your booking. The remaining balance is due within 7 days after installation.

Deposit

£250 to reserve your date and trigger materials ordering.

Balance

Due after installation (within 7 days). You’ll get all paperwork at handover.


Need to spread the cost?

Finance is available on selected packages through TradeHelp, subject to status and lender approval. Card or bank transfer remains available for non-finance bookings where enabled.

Aftercare & Warranty

After install we register what needs registered and make sure you know exactly what to do next.

  • Warranty registration (manufacturer dependent)
  • Annual service reminder (recommended to keep warranty valid)
  • Support if you spot anything unusual after install
Read FAQs